三年片在线观看大全,三年片免费观看大全有,三年片免费观看大全第一集,三年片观看免费观看大全古装剧

Search
首頁(yè) > 新聞中心 > 媒體關(guān)注
Homegrown high-capacity impulse turbines to be installed in hydropower station in China’s Tibet
來(lái)源:
作者:
日期:2023-06-12

GLOBALink | Homegrown high-capacity impulse turbines to be installed in hydropower station in China's Tibet

LHASA, June 11 (Xinhua) -- Two homegrown impulse turbines, each with a maximum capacity of 500 megawatts, will be installed at the Datang Zala Hydropower Station in southwest China's Tibet Autonomous Region.

China Datang Corporation Ltd., organizer of the research and development team of the turbines, made the announcement Friday at an event advancing the project.

Independently developed by China, the turbines can better utilize the high water head on the Yuqu River, where the power station is located.

The main section of the Datang Zala Hydropower Station started construction on Friday.

The power station is scheduled to be put into operation in 2028.

It has a total installed capacity of 1.015 million kilowatts and a designed annual power generation capacity of 3.946 billion kilowatt hours.

Once completed, it can save 1.3 million tonnes of standard coal each year, and reduce carbon dioxide emissions by 3.42 million tonnes.

From:https://xhnewsapi.xinhuaxmt.com/share/news_pc?id=832620268339200

Produced By CMS 網(wǎng)站群內(nèi)容管理系統(tǒng) publishdate:2025-03-10 11:29:47
赤壁市| 景洪市| 治多县| 亚东县| 江西省| 黑龙江省| 渝北区| 龙州县| 英德市| 武清区| 昌宁县| 新丰县| 文成县| 香港 | 延长县| 辛集市| 义乌市| 平谷区| 祁阳县| 屯昌县| 连云港市| 高邑县| 凌海市| 桃源县| 天门市| 大足县| 肥西县| 桦南县| 德惠市| 开封县| 漳州市| 延长县| 光泽县| 贵德县| 遵义县| 庆阳市| 张家界市| 墨脱县| 大足县| 疏勒县| 寻甸|